  "id": "in-iurc-46097-im-large-load-tariff-order",
  "jurisdiction": "IN",
  "kind": "order",
  "status": "approved",
  "title": "Indiana Michigan Power (I&M) Large Load Terms, IURC Order Approving Settlement Agreement Modifying Tariff I.P. (Cause No. 46097)",
  "citation": "In the Matter of the Verified Petition of Indiana Michigan Power Company for Approval of Modifications to its Industrial Power Tariff, Tariff I.P., Ind. Util. Regul. Comm'n Cause No. 46097, Order of the Commission (approved Feb. 19, 2025)",
  "docket_no": "46097",
  "agency": "Indiana Utility Regulatory Commission (IURC)",
  "utility": "Indiana Michigan Power Company (I&M), an American Electric Power (AEP) subsidiary",
  "verification": "verified",
  "updated_at": "2026-08-26T14:45:56+00:00",
  "record_url": "https://verifiedatlas.com/i/in-iurc-46097-im-large-load-tariff-order/",
  "snapshot_built_at": "2026-09-14T14:33:17+00:00",
  "sources": [
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.31 (Finding A, Applicability)",
      "quote": "Under the Settlement Agreement, the Large Load Terms will apply to customers taking service on I&M Tariff I.P. with contract capacity greater than or equal to 70 MW at an individual site or 150 MW on an aggregated basis (“Large Load Customer”).",
      "quote_chars": 244,
      "title": "IURC Cause No. 46097, Order of the Commission (Indiana Michigan Power, Tariff I.P. Large Load Terms)",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.31 (Finding B, Mandatory Term)",
      "quote": "As shown in Section I.A.2 of the Settlement Agreement, the Settling Parties agreed to an Initial Contract Term of not less than 12 years, commencing after any Load Ramp Period ends. The Load Ramp Period can be no greater than five years.",
      "quote_chars": 237,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.33 (Finding C, Monthly Billing Demand, Settlement Agreement § I.A.3 tariff language reproduced in the Order)",
      "quote": "the monthly demand so established shall in no event be less than the greater of (a) 80 percent of the Large Load Customer’s contract capacity specified for the applicable time period of the Contract Term; or (b) 80 percent of the Large Load Customer’s highest previously established Monthly Billing Demand during the past 11 months.",
      "quote_chars": 332,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.36 (Finding E, Collateral Requirements; Finding E opens on p.35)",
      "quote": null,
      "quote_chars": 478,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.37 (Finding F, Contractual Flexibility and Exit Fee)",
      "quote": null,
      "quote_chars": 484,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.49 (Ordering Paragraph 3)",
      "quote": null,
      "quote_chars": 210,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "Settlement Agreement Attachment A (Section I.A.1, reproduced within the Order)",
      "quote": null,
      "quote_chars": 338,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "Settlement Agreement Attachment A, Collateral Requirements clause (reproduced within the Order, immediately following Tariff I.P. Sheet No. 21.7)",
      "quote": null,
      "quote_chars": 281,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.39 (Finding F, CAC witness Inskeep testimony)",
      "quote": null,
      "quote_chars": 231,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.33 (Finding C, OUCC witness Eckert testimony)",
      "quote": null,
      "quote_chars": 359,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.51 (unnumbered), Concurring Opinion of Chairman James F. Huston and Commissioner Wesley R. Bennett, a separately captioned document bound into the same PDF immediately after the Order's p.50 signature page",
      "quote": null,
      "quote_chars": 164,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "PDF document metadata (CreationDate field)",
      "quote": null,
      "quote_chars": 37,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.1",
      "quote": null,
      "quote_chars": 144,
      "title": "IURC Cause No. 46097 -- Order of the Commission (Indiana Michigan Power, Tariff I.P. Large Load Terms)",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.1",
      "quote": null,
      "quote_chars": 166,
      "title": "IURC Cause No. 46097 -- Order of the Commission (Indiana Michigan Power, Tariff I.P. Large Load Terms)",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.34 (Finding D, Minimum Charge, Settlement Agreement § I.A.4 tariff language and rate table, reproduced in the Order)",
      "quote": null,
      "quote_chars": 232,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.34 (Finding D, Minimum Charge, I&M witness Williamson)",
      "quote": null,
      "quote_chars": 204,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.35 (Finding D, Minimum Charge, CAC witness Inskeep's worked example)",
      "quote": null,
      "quote_chars": 736,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.38 (Finding F, I&M witness Williamson on the Exit Fee Period)",
      "quote": null,
      "quote_chars": 260,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.38 (Finding F, Settlement Agreement § I.A.6.c, mitigation)",
      "quote": null,
      "quote_chars": 497,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "Settlement Agreement Attachment A, Tariff I.P. sheet (Original Sheet No. 21.7), Collateral Requirements, acceptable forms (PDF p.73)",
      "quote": null,
      "quote_chars": 481,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.40 (Finding F, the Commission's own findings)",
      "quote": null,
      "quote_chars": 258,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.18 (Google witness Farr's recommended policies)",
      "quote": null,
      "quote_chars": 564,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.50 (Ordering Paragraphs 6-8; signature block)",
      "quote": null,
      "quote_chars": 439,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.7 (OUCC witness Kelley's testimony)",
      "quote": null,
      "quote_chars": 311,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "pp.12-13 (Data Center Intervenor Evidence, A. Amazon, witness Fradette)",
      "quote": null,
      "quote_chars": 339,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.in.gov/iurc/files/ord_46097_021925.pdf",
      "pinpoint": "p.18 (Data Center Intervenor Evidence, C. Google, witness Farr)",
      "quote": null,
      "quote_chars": 322,
      "title": "IURC Cause No. 46097, Order of the Commission",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://iurc.portal.in.gov/docketed-case-details/?id=b8cd5780-0546-ef11-8409-001dd803817e",
      "pinpoint": "api/document/orders response for legalcaseid b8cd5780-0546-ef11-8409-001dd803817e",
      "quote": null,
      "quote_chars": 328,
      "title": "IURC docketed case record, Cause No. 46097, Orders (Commission case-management database)",
      "source_type": "government",
      "verification": "verified"
    },
    {
      "url": "https://iurc.portal.in.gov/docketed-case-details/?id=b8cd5780-0546-ef11-8409-001dd803817e",
      "pinpoint": "api/list/parties response for legalcaseid b8cd5780-0546-ef11-8409-001dd803817e",
      "quote": null,
      "quote_chars": 927,
      "title": "IURC docketed case record, Cause No. 46097, Parties",
      "source_type": "government",
      "verification": "verified"
    },
    {
      "url": "https://iurc.portal.in.gov/docketed-case-details/?id=b8cd5780-0546-ef11-8409-001dd803817e",
      "pinpoint": "api/search/advanced response (txtCause=46097) and api/document/appeals response",
      "quote": null,
      "quote_chars": 189,
      "title": "IURC docketed case record, Cause No. 46097, case status and appeals",
      "source_type": "government",
      "verification": "verified"
    },
    {
      "url": "https://engage.cityoffortwayne.org/data-center",
      "pinpoint": "FAQ, \"How will the data center affect electric utility rates for the average customer?\"",
      "quote": null,
      "quote_chars": 379,
      "title": "City of Fort Wayne, \"Google Data Center\" FAQ, ELECTRICITY USEAGE section",
      "source_type": "government",
      "verification": "verified"
    },
    {
      "url": "https://www.prnewswire.com/news-releases/indiana-michigan-power-receives-order-in-large-load-settlement-302380806.html",
      "pinpoint": "Body, paragraphs 1-2 and quote paragraph",
      "quote": null,
      "quote_chars": 476,
      "title": "Indiana Michigan Power Receives Order in Large Load Settlement (I&M/AEP press release)",
      "source_type": "company",
      "verification": "verified"
    },
    {
      "url": "https://www.prnewswire.com/news-releases/indiana-michigan-power-receives-order-in-large-load-settlement-302380806.html",
      "pinpoint": "Body, penultimate paragraph",
      "quote": null,
      "quote_chars": 205,
      "title": "Indiana Michigan Power Receives Order in Large Load Settlement (I&M/AEP press release)",
      "source_type": "company",
      "verification": "verified"
    },
    {
      "url": "https://www.govtech.com/artificial-intelligence/indiana-data-center-could-bring-significant-power-use",
      "pinpoint": "Body, I&M paragraph",
      "quote": null,
      "quote_chars": 177,
      "title": "GovTech / The Times (Munster, Ind.), \"Indiana Data Center Could Bring Significant Power Use\"",
      "source_type": "journalism",
      "verification": "verified"
    },
    {
      "url": "https://www.govtech.com/artificial-intelligence/indiana-data-center-could-bring-significant-power-use",
      "pinpoint": "Body, Inskeep paragraph",
      "quote": null,
      "quote_chars": 321,
      "title": "GovTech / The Times (Munster, Ind.), \"Indiana Data Center Could Bring Significant Power Use\"",
      "source_type": "journalism",
      "verification": "verified"
    },
    {
      "url": "https://www.journalgazette.net/business/google-announces-2-billion-investment-in-fort-wayne-data-center/article_407f8a2c-03e0-11ef-b4ce-b3bc10dc55f0.html",
      "pinpoint": "Body, Kava/I&M paragraph",
      "quote": null,
      "quote_chars": 269,
      "title": "The Journal Gazette, \"Google announces $2 billion investment in Fort Wayne data center\" (Maya Wilkins)",
      "source_type": "journalism",
      "verification": "verified"
    }
  ],