  "id": "va-dominion-gs5-pur2025-00058-tar",
  "jurisdiction": "VA",
  "kind": "tariff",
  "status": "approved",
  "title": "Rate Schedule GS-5 (Large-Load / High Energy Use Customer Class), Dominion Energy Virginia 2025 Biennial Review",
  "citation": "Application of Virginia Electric and Power Company for a 2025 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services pursuant to § 56-585.1 A of the Code of Virginia, Case No. PUR-2025-00058, 2025 S.C.C. Ann. Rept. 521, 527-528, Final Order",
  "docket_no": "PUR-2025-00058",
  "agency": "Virginia State Corporation Commission (SCC)",
  "utility": "Virginia Electric and Power Company d/b/a Dominion Energy Virginia",
  "verification": "verified",
  "updated_at": "2026-08-26T14:45:56+00:00",
  "record_url": "https://verifiedatlas.com/i/va-dominion-gs5-pur2025-00058-tar/",
  "snapshot_built_at": "2026-09-14T14:33:17+00:00",
  "sources": [
    {
      "url": "https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF",
      "pinpoint": "p.23 (\"RATE SCHEDULE GS-5\" / \"GS-5 Rate Class\")",
      "quote": "The GS-5 rate class shall include customers with: (1) a measured or contracted demand of 25 megawatts (“MW”) or greater on a contiguous site; and (2) a measured or expected load factor of at least 75%.",
      "quote_chars": 201,
      "title": "State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order (Application of Virginia Electric and Power Company for a 2025 biennial review)",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF",
      "pinpoint": "p.24 (\"Contract\")",
      "quote": "The contract provisions shall apply to customers taking initial service and signing an ESA on or after January 1, 2027. The contract term shall be 14 years. A customer may also include, within the contract term, a load ramp period not to exceed four years (with a minimum annual ramp of 20%). If the customer continues to take service after the conclusion of the contract term, the minimum charges approved herein shall continue. If the customer ceases operations or otherwise defaults on its agreement during the contract term, the customer shall be required to pay an exit fee covering any outstanding minimum charges over the remaining contract duration (subject to capacity reassignment as addressed below).",
      "quote_chars": 711,
      "title": "State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF",
      "pinpoint": "p.25 (\"Collateral Requirements\")",
      "quote": "The collateral requirements shall apply to customers taking initial service and signing an ESA on or after January 1, 2027. The Commission approves the Company’s proposed collateral requirement terms, including: (1) $1.5 million/MW; (2) a reduction up to 70% based on the customer’s established credit; (3) provisions for third-party guarantees and letters of credit; and (4) releasing 1714th of the collateral requirement each year throughout the contract term.",
      "quote_chars": 462,
      "title": "State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF",
      "pinpoint": "p.25 (\"Minimum Demand Charges\")",
      "quote": null,
      "quote_chars": 243,
      "title": "State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF",
      "pinpoint": "pp.25-26",
      "quote": null,
      "quote_chars": 559,
      "title": "State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF",
      "pinpoint": "p.27 (\"Capacity Reductions\")",
      "quote": null,
      "quote_chars": 279,
      "title": "State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF",
      "pinpoint": "pp.22-23 (\"Large Load Interconnection Queue\")",
      "quote": null,
      "quote_chars": 355,
      "title": "State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.scc.virginia.gov/docketsearch/DOCS/8dt001!.PDF",
      "pinpoint": "p.3, footnote 9",
      "quote": null,
      "quote_chars": 324,
      "title": "State Corporation Commission of Virginia, Case No. PUR-2026-00056, Final Order (Rider T1 rate adjustment clause)",
      "source_type": "order",
      "verification": "verified"
    },
    {
      "url": "https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/fact-sheets/scc-data-center-initiatives-02-2026.pdf",
      "pinpoint": "p.2 (\"WHAT MINIMUM CHARGES WILL APPLY TO LARGE LOAD CUSTOMERS?\")",
      "quote": null,
      "quote_chars": 384,
      "title": "Virginia SCC, \"SCC Data Center Initiatives: Ensuring Data Centers Pay Their Own Costs\" (fact sheet)",
      "source_type": "government",
      "verification": "verified"
    },
    {
      "url": "https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/fact-sheets/scc-data-center-initiatives-02-2026.pdf",
      "pinpoint": "p.1",
      "quote": null,
      "quote_chars": 578,
      "title": "Virginia SCC, \"SCC Data Center Initiatives: Ensuring Data Centers Pay Their Own Costs\" (fact sheet)",
      "source_type": "government",
      "verification": "verified"
    },
    {
      "url": "https://www.scc.virginia.gov/DocketSearchAPI/breeze/CaseDetails/GetDetail?$filter=Case_Number%20eq%20'PUR-2025-00058'",
      "pinpoint": "case detail record, Final_Order_Date / Disposition_Date / Status / Appealed fields",
      "quote": null,
      "quote_chars": 576,
      "title": "Virginia SCC DocketSearch case record for Case No. PUR-2025-00058 (VW_EDOCKET_MATTERDETAILS, MATTER_NO 146025)",
      "source_type": "government",
      "verification": "verified"
    },
    {
      "url": "https://www.thomasjeffersoninst.org/the-scc-decides-dominions-rates-and-profits-go-up-new-rules-on-data-centers/",
      "pinpoint": "article body, paragraph beginning \"One goal of the new contract requirements...\"",
      "quote": null,
      "quote_chars": 362,
      "title": "Thomas Jefferson Institute for Public Policy, \"The SCC Decides: Dominion’s Rates and Profits Go Up, New Rules on Data Centers\" (by Stephen D. Haner)",
      "source_type": "advocacy",
      "verification": "verified"
    }
  ],
  "access": "Recorded term fields, and quotes past the first 3, are in the $99 state pass or the $199 all-states pass. Identity, citation, every source document and every pinpoint are open. https://verifiedatlas.com/pricing/"
}