MidAmerican Energy Company: Rate ICR, Individual Customer Rate

two-reviewer tariff approved ia-midam-rate-icr

This record is listed in full and read in part. Its identity, citation, docket, status and review state are open, and so are all 8 of its source documents with their pinpoints, so you can go read the primary text yourself. The first 3 extracted quotes are open too. The recorded term fields, and the remaining quotes, are in the $99 Iowa pass and the $199 all-states pass. Pricing.

Record created 2026-08-22, last updated 2026-08-22. Snapshot built September 14, 2026. JSON

Fields, as recorded

State
IA
Kind
tariff
Status
approved
Agency
Iowa Utilities Commission (IUC, formerly Iowa Utilities Board)
Utility
MidAmerican Energy Company
Citation
MidAmerican Energy Company, Electric Tariff No. 2, Rate ICR - Individual Customer Rate, Sheet Nos. 215-219, filed with the Iowa Utilities Board; sheet dates ranging from Original Sheet No. 215 (Issued August 6, 2014, Effective July 31, 2014) through 2nd Revised Sheet No. 217 (Issued March 29, 2018, Effective May 1, 2018)
Effective
2014-07-31
Threshold MW
$99 Iowa pass
Mandatory
$99 Iowa pass
Summary
$99 Iowa pass
Exit terms
$99 Iowa pass
Cost allocation
$99 Iowa pass
Locked fields
$99 Iowa pass 5 recorded fields on this record are in the state and all-states passes.

Sources

8 rows, every one with a quote and a pinpoint. 3 quotes open here
  • MidAmerican Energy Company Electric Tariff No. 2 - Rate ICR (Individual Customer Rate), Sheet No. 215 tariff two-reviewer

    “Service under this rate is available under written agreement for customers that meet the one of the two following conditions: Customer has a demand of 15,000 kW or greater. Service is supplied by a customer-owned substation that is on or directly adjacent to the customer's Premises, operating at 69 kV or above and customer has a demand of 3,000 kW or greater.”

    PDF p.161 of 413, Original Sheet No. 215, Available
    https://www.midamericanenergy.com/media/pdf/iowa-electric-tariffs.pdf
    Fetched directly via curl (Chrome UA) from midamericanenergy.com; 413-page, 10.5MB born-digital PDF (the utility's full current Iowa electric tariff book). Relevant pages located by full-document text search (PyMuPDF) for "Individual Customer", then text-extracted from the matching page range. No OCR needed.

  • MidAmerican Energy Company Electric Tariff No. 2 - Rate ICR (Individual Customer Rate), Sheet No. 219 tariff two-reviewer

    “In the event a Rate ICR customer's load drops below 15,000 kW for 12 consecutive months and the customer is not served at transmission voltage, such customer shall be ineligible for Rate ICR, and the Company shall terminate the customer's Rate ICR contract effective the following billing period.”

    PDF p.165 of 413, Original Sheet No. 219, Term and Termination
    https://www.midamericanenergy.com/media/pdf/iowa-electric-tariffs.pdf
    Same fetch as prior source row.

  • MidAmerican Energy Company Electric Tariff No. 2, Sheet No. 2 (communities served) tariff two-reviewer

    “Listed below are the communities (in whole or part) to which this schedule is applicable.”

    PDF p.8 of 413, 1st Revised Sheet No. 2
    https://www.midamericanenergy.com/media/pdf/iowa-electric-tariffs.pdf
    Verifier-added at the Iowa state gate, 2026-08-25. Re-fetched raw (curl, Chrome 126 UA) and quote-checked verbatim against the fetched document. The header of MidAmerican's own filed community list (Sheet Nos. 2 through 2.60, PDF pp.8-14). Altoona appears on Sheet No. 2 (PDF p.8); Council Bluffs, Pottawattamie County and Dallas County on Sheet No. 2.10 (PDF p.9); Polk County on Sheet No. 2.40 (PDF p.12); Waukee, West Des Moines and Warren County on Sheet No. 2.50 (PDF p.13). Cedar Rapids appears NOWHERE in the 413-page tariff (zero occurrences). This is the filed-tariff basis on which the four MidAmerican facility utility ties in this file now rest - see the tie-strength statement on each facility row. It establishes SERVICE TERRITORY from the utility's own filed schedule; it is not a campus-specific service agreement, and no such agreement was reached this gate.

  • MidAmerican Energy Company Electric Tariff No. 2, Sheet No. 218 tariff two-reviewer

    $99 Iowa pass quote, 245 characters as extracted. The document, the pinpoint and the review state are open below.

    PDF p.164 of 413, Substitute Original Sheet No. 218, Contract
    https://www.midamericanenergy.com/media/pdf/iowa-electric-tariffs.pdf

  • MidAmerican Energy Company Electric Tariff No. 2, Sheet No. 219 tariff two-reviewer

    $99 Iowa pass quote, 157 characters as extracted. The document, the pinpoint and the review state are open below.

    PDF p.165 of 413, Original Sheet No. 219, Confidentiality
    https://www.midamericanenergy.com/media/pdf/iowa-electric-tariffs.pdf

  • MidAmerican Energy Company Electric Tariff No. 2, Sheet No. 216 tariff two-reviewer

    $99 Iowa pass quote, 32 characters as extracted. The document, the pinpoint and the review state are open below.

    PDF p.162 of 413, Substitute 2nd Revised Sheet No. 216, Net Monthly Rate Per Meter
    https://www.midamericanenergy.com/media/pdf/iowa-electric-tariffs.pdf

  • MidAmerican Energy Company Electric Tariff No. 2, Sheet No. 217 tariff two-reviewer

    $99 Iowa pass quote, 271 characters as extracted. The document, the pinpoint and the review state are open below.

    PDF p.163 of 413, 2nd Revised Sheet No. 217, Adjustment Clauses and Riders
    https://www.midamericanenergy.com/media/pdf/iowa-electric-tariffs.pdf

  • MidAmerican Energy - "How MidAmerican protects customers from data center costs" company two-reviewer

    $99 Iowa pass quote, 467 characters as extracted. The document, the pinpoint and the review state are open below.

    article body, "How We Keep Rates Fair for Everyone" section