Verified Atlas / Data Centers
Built from the live database: September 14, 202657 instruments · 79 facilities · 212 claims · 1036 sourcesall with quote and pinpointEvery value on this page comes from a row in that snapshot.
View
Citable provisions first: exit and collateral language with quote and pinpoint, then the open dockets you have to re-check.

Atlas / Georgia

Georgia

GA · instruments, facilities, claims and sources, joined
7
Instruments
10
Facilities
30
Claims
137
Source rows
7/7
Two-reviewer instruments
Georgia detail is in the $99 state pass. Every record is listed by name below so you can see the size of what is here. Two rows in each table are open as a sample. Missouri is open in full at any time, and cross-state comparison is the $199 all-states pass. Both are launch prices, below the list prices they rise to, and the price you subscribe at stays yours. Pricing.

Instruments

Statutes, tariffs, orders, dockets, ordinancesStarts here in this view

Every statute, tariff, order and docket governing large loads in this state, with the collected text under each one.The rules a project here runs into: what triggers them, what they cost you to leave, what they require up front.The whole regulatory stack in this state, kind by kind.The actual laws, tariffs and orders behind any story about data centers in this state.The regime a project here is underwritten against, instrument by instrument.

7 instrument records.
InstrumentRecordUtility or agencyThreshold MWKey terms as collectedSources
Order Approving Revisions to Georgia Power Company's Rules and Regulations (100 MW Large-Load Customer Cost-Recovery Terms)
ga-psc-docket44280-order-large-load-rules-2025-01
order approved two-reviewerGeorgia Power Company$99 Georgia pass$99 Georgia pass10
Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing (Large-Load Minimum Bill, Termination, and Collateral Framework)
ga-psc-docket44280-order-tariff-compliance-large-load-2025-04
order approved two-reviewerGeorgia Power Company100

Minimum-bill liability survives early termination for each period of the remaining term of the contract. No buyout mechanism recorded.

Exit terms: verbatim text and sources

Collected text, verbatim from the record

THE HEADLINE TERM -- minimum-bill liability SURVIVES early termination. Verbatim from the order's Section II, FINDINGS OF FACT (p.2), describing the draft terms and conditions the Commission then approved: "Under the draft terms and conditions, customers would pay the higher of tariffed rates or a minimum bill amount each billing period they are a customer. If the customer ended the contract early, the customer would be liable for the minimum bill amounts (not tariffed rate amounts) for each period for the remaining term of the contract. The tariffed rates would be subject to future review and modification by the Commission using normal ratemaking processes. However, the minimum bill amounts would not." That framework is then ADOPTED by the order's own decretal language (p.4): "ORDERED FURTHER, that the Commission approves the updated tariffs and the large load contracting framework for the terms and conditions implementing the revisions to the Company’s Rules and Regulations as approved in the Revision Approval Order," and (p.5) "...including with respect to the minimum bill, termination, and collateral provisions established for these large load customers." So the remaining-term minimum-bill exposure is a Commission-approved framework term, not merely a Staff description. The PSC's own March 2026 Data Center Fact Sheet states the same purpose in plain words: "The purpose for the new rule is to ensure data centers continue paying for new infrastructure even if they leave the state." NOTE (unchanged by the gate): an unsourced secondary claim that an early-terminating customer owes only "2 years" of minimum bills is contradicted by this order's text and is NOT recorded as a fact; the gate found no primary supporting it.

Source row two-reviewer

“Under the draft terms and conditions, customers would pay the higher of tariffed rates or a minimum bill amount each billing period they are a customer. If the customer ended the contract early, the customer would be liable for the minimum bill amounts (not tariffed rate amounts) for each period for the remaining term of the contract. The tariffed rates would be subject to future review and modification by the Commission using normal ratemaking processes. However, the minimum bill amounts would not.”

p.2
https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/222325/103476

Georgia PSC, Docket No. 44280 (GPC 2022 Rate Case), Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing (filed 04/17/2025)

Source row two-reviewer

“Staff has reviewed and recommended approval of the large load contracting framework for the terms and conditions implementing the revisions to the Company’s Rules and Regulations approved by the Commission in the Revision Approval Order. The terms and conditions of each large load contract including the minimum bill, termination, and collateral provisions will apply this framework.”

p.3 (Finding of Fact / Staff recommendation ¶3)
https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/222325/103476

Georgia PSC, Docket No. 44280 (GPC 2022 Rate Case), Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing (filed 04/17/2025)

Source row two-reviewer

“As defined in the revisions to the Rules and Regulations (100 MW or greater at one or more premises located on one tract or contiguous tracts of land), the Company will file each such contract with the Commission at least thirty (30) days prior to execution of the contract. At the time of such filing, the Company will provide Commission Staff documentation demonstrating that the contract complies with the requirements of the Revision Approval Order. Once filed, Commission Staff may raise objections to the contract, and the Company and Commission Staff will work together in good faith to resolve any such objections. If Staff does not file an objection within thirty (30) days of the filing of the contract, the contract shall be deemed approved.”

p.3 (Finding of Fact / Staff recommendation ¶5)
https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/222325/103476

Georgia PSC, Docket No. 44280 (GPC 2022 Rate Case), Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing (filed 04/17/2025)

All 5 source rows for this record

Framework approved for the minimum bill, termination and collateral provisions. The order states no dollar figure and no formula. Open item.

Collateral: verbatim text and sources

Collected text, verbatim from the record

"Staff has reviewed and recommended approval of the large load contracting framework for the terms and conditions implementing the revisions to the Company’s Rules and Regulations approved by the Commission in the Revision Approval Order. The terms and conditions of each large load contract including the minimum bill, termination, and collateral provisions will apply this framework. To the extent that the actual language in a contract differs from the language in the draft terms and conditions provided to Staff, Staff may object to such language if Staff deems that such modification is substantive and does not adequately protect existing customers from bearing any of the costs of adding the customer." The order does not itself state a collateral dollar figure or formula; it approves a framework reviewed by Staff in a separate (not independently obtained this tick) draft terms-and-conditions document -- open item.

Source row two-reviewer

“Under the draft terms and conditions, customers would pay the higher of tariffed rates or a minimum bill amount each billing period they are a customer. If the customer ended the contract early, the customer would be liable for the minimum bill amounts (not tariffed rate amounts) for each period for the remaining term of the contract. The tariffed rates would be subject to future review and modification by the Commission using normal ratemaking processes. However, the minimum bill amounts would not.”

p.2
https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/222325/103476

Georgia PSC, Docket No. 44280 (GPC 2022 Rate Case), Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing (filed 04/17/2025)

Source row two-reviewer

“Staff has reviewed and recommended approval of the large load contracting framework for the terms and conditions implementing the revisions to the Company’s Rules and Regulations approved by the Commission in the Revision Approval Order. The terms and conditions of each large load contract including the minimum bill, termination, and collateral provisions will apply this framework.”

p.3 (Finding of Fact / Staff recommendation ¶3)
https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/222325/103476

Georgia PSC, Docket No. 44280 (GPC 2022 Rate Case), Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing (filed 04/17/2025)

Source row two-reviewer

“As defined in the revisions to the Rules and Regulations (100 MW or greater at one or more premises located on one tract or contiguous tracts of land), the Company will file each such contract with the Commission at least thirty (30) days prior to execution of the contract. At the time of such filing, the Company will provide Commission Staff documentation demonstrating that the contract complies with the requirements of the Revision Approval Order. Once filed, Commission Staff may raise objections to the contract, and the Company and Commission Staff will work together in good faith to resolve any such objections. If Staff does not file an objection within thirty (30) days of the filing of the contract, the contract shall be deemed approved.”

p.3 (Finding of Fact / Staff recommendation ¶5)
https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/222325/103476

Georgia PSC, Docket No. 44280 (GPC 2022 Rate Case), Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing (filed 04/17/2025)

All 5 source rows for this record

5
Order Adopting Stipulated Agreement, Georgia Power Company's 2023 Integrated Resource Plan Update (Large-Load Revenue-Neutrality and Quarterly Reporting Commitments)
ga-psc-docket55378-order-2023-irp-update-stipulation-2024
order approved two-reviewerGeorgia Power Company$99 Georgia pass$99 Georgia pass8
House Bill 1192 (2024) -- Two-Year Suspension of New High-Technology Data Center Sales Tax Exemption Certificates -- PASSED LEGISLATURE, VETOED BY GOVERNOR
ga-hb1192-2024-datacenter-tax-exemption-suspension-vetoed
statute withdrawn two-reviewerGeorgia General Assembly; Office of the Governor$99 Georgia pass$99 Georgia pass5
High-Technology Data Center Equipment Sales & Use Tax Exemption (O.C.G.A. § 48-8-3(68.1))
ga-ocga-48-8-3-68-1-hightech-datacenter-sales-tax-exemption
statute enacted two-reviewerGeorgia Department of Revenue$99 Georgia pass$99 Georgia pass13
Senate Bill 34 (2025-2026) -- Full Ratepayer Cost-Shift Protection from Large-Load/Data-Center Infrastructure Costs -- STALLED, ITS LANGUAGE WATERED DOWN AND FOLDED INTO S.B. 410
ga-sb34-2025-2026-large-load-ratepayer-cost-shift-bill-folded-into-sb410
statute withdrawn two-reviewerGeorgia General Assembly$99 Georgia pass$99 Georgia pass3
Senate Bill 410 (2026) -- Data Center Tax Exemption Repeal and Ratepayer Cost-Shift Protection -- PASSED SENATE, DIED IN HOUSE (NOT ENACTED)
ga-sb410-2026-datacenter-tax-repeal-and-ratepayer-cost-shift-bill-died-house
statute withdrawn two-reviewerGeorgia General Assembly$99 Georgia pass$99 Georgia pass13

Provenance key. two-reviewer a second reviewer checked the record against primary sources with no open disagreement. single-reviewer one careful reviewer built it from primary sources and no second reviewer has re-read it yet. disputed two admissible sources disagree and a re-read did not settle it.

Facilities

10 recordsStarts here in this view

The projects on the ground here, and which instruments each one is governed by.Who is already building in this state, at what size, and under which utility.The named large loads in this state, with owner, county and status on every row.The data centers themselves: who owns them, which county they sit in, and what was announced.Announced investment and requested megawatts per project, with the status of each one.

10 facility records. 2 open here.
FacilityCountyOwnerUtilityStatusAnnounced investmentMW requestedGoverned by
Crow Holdings / CHI Acquisitions Proposed Data Center - Fayetteville (denied; appeal withdrawn)
ga-fac-crowholdings-fayetteville-denied
Fayette County
Fayetteville (north of Fayette Pavilion shopping center, along Highway 85 North)
Crow Holdings Development / CHI/Acquisitions, LP
Crow Holdings
cancelled two-reviewer
Google Data Center - Douglas County (Lithia Springs)
ga-fac-google-douglas-lithia-springs
Douglas County
Lithia Springs
Google LLC
Alphabet Inc.
Georgia Poweroperating single-reviewer$300M
Google Data Center - LaGrange ('Project Pegasus'), Troup County
ga-fac-google-lagrange-pegasus-troup
Troup County
LaGrange (411 Pegasus Parkway, Georgia International Business Park)
$99 Georgia passCity of LaGrange municipal utilities (electric supplier for this site not established by any source in this record)under-construction single-reviewer$99 Georgia pass$99 Georgia pass
Meta Platforms Data Center - Newton County (Social Circle / Stanton Springs)
ga-fac-meta-newton-social-circle
Newton County
Social Circle (Stanton Springs industrial park)
$99 Georgia passNewton County Water and Sewerage Authority (water; electric supplier not named by any source in this record)operating single-reviewer$99 Georgia pass$99 Georgia pass
Microsoft Data Center - Douglasville (Douglas County), part of 'East US 3' region
ga-fac-microsoft-douglasville-douglas
Douglas County
Douglasville
$99 Georgia passunder-construction two-reviewer$99 Georgia pass$99 Georgia pass
Microsoft Data Center Campus - Palmetto / South Fulton County
ga-fac-microsoft-palmetto-fulton
Fulton County
Palmetto (unincorporated South Fulton County)
$99 Georgia passGeorgia Powerunder-construction single-reviewer$99 Georgia pass$99 Georgia pass
Project Peach - Coweta County Data Center Campus
ga-fac-project-peach-coweta
Coweta County
Unincorporated Coweta County, near City of Palmetto (Johnston Circle / Weldon Road at SR 14 / US 29)
$99 Georgia passpermitted single-reviewer$99 Georgia pass$99 Georgia pass
Project Sail - Coweta County Data Center Campus (proposed)
ga-fac-project-sail-coweta
Coweta County
Unincorporated Coweta County
$99 Georgia passpermitted single-reviewer$99 Georgia pass$99 Georgia pass
QTS Data Centers - Fayetteville Campus (Fayette County) / 'Project Excalibur'
ga-fac-qts-fayetteville-fayette
Fayette County
Fayetteville (Highway 54 West, between Veterans Parkway and Tyrone Road)
$99 Georgia passFayette County Water System (water; electric supplier not named by any source in this record)under-construction single-reviewer$99 Georgia pass$99 Georgia pass
xAI / X Data Center - Atlanta (Fulton County)
ga-fac-xai-x-atlanta-fulton
Fulton County
Atlanta
$99 Georgia passunknown single-reviewer$99 Georgia pass$99 Georgia pass

0 of 10 facility records name the instruments that govern them. The rest do not, and the table shows that rather than guessing.

Claims

30 recordsStarts here in this view

What parties asserted on the record here, quoted, with the claimant class named.What has been promised publicly in this state about jobs, tax and load.What intervenors and officials said in this state, in their own words.Who said what about data centers in this state, quoted exactly, with the source under each one.Promises made in this market, quoted. We hold what was promised, not what was delivered.

30 claims, each with a named claimant and a claimant class. 2 open here. A claim recorded here is a record of who said what, not a finding that it is true.
TypeClaimantClaim, verbatim
investmentGeorgia Power Company, press release
developer
Georgia Power has filed nearly 2 gigawatts of new customer contracts with the Georgia Public Service Commission (PSC)... These agreements are the first to be reached under the Georgia PSC's newly approved rules and regulations.
Source

Source row two-reviewer

“Georgia Power has filed nearly 2 gigawatts of new customer contracts with the Georgia Public Service Commission (PSC), marking a major milestone for the state’s energy landscape. These agreements are the first to be reached under the Georgia PSC’s newly approved rules and regulations, which are designed to provide Georgia Power with the flexibility to sustainably serve large-load customers while safeguarding residential and small business customers from additional costs.”

Article body, first paragraph
https://www.georgiapower.com/news-hub/press-releases/georgia-power-highlights-new-customer-contracts-continued-economic-growth-updated-forecasts-in-latest-filings-with-georgia-psc.html

Georgia Power Company press release, 'Georgia Power highlights first contracts under new rules & regulations...'

power_renewableGeorgia Public Service Commission, March 2026 Data Center Fact Sheet
government
On December 19, 2025, the Commissioners voted to approve an agreement between the PSC's Public Interest Advocacy Staff and Georgia Power that certifies the construction of 9,985 MW of new energy generation – approximately 80 percent of which is expected to power data centers.
Source

Source row two-reviewer

“On December 19, 2025, the Commissioners voted to approve an agreement between the PSC’s Public Interest Advocacy Staff and Georgia Power that certifies the construction of 9,985 MW of new energy generation – approximately 80 percent of which is expected to power data centers. The Commission’s order protects existing ratepayers from increased rates even if the data center projections do not come to fruition (see agreement).”

p.2
https://psc.ga.gov/site/downloads/datacenterfactsheet.pdf

Georgia PSC, 'Data Center Fact Sheet' (March 2026)

rate_impactAtlanta Journal-Constitution (Kristi Swartz), reporting Georgia Power's pledge in connection with the PSC's data center generation-expansion approval
press
$99 Georgia pass
rate_impactAtlanta Journal-Constitution (Kristi Swartz), attributing the estimate to Georgia PSC staff and the Southern Environmental Law Center
press
$99 Georgia pass
community_benefitGeorgia PIRG (Aidyn Levin), statement quoted by The Current GA / Georgia Recorder
advocacy
$99 Georgia pass
rate_impactGeorgia Power Company and Georgia PSC, Stipulated Agreement adopted in Docket No. 55378
utility
$99 Georgia pass
power_renewableGeorgia Public Service Commission, March 2026 Data Center Fact Sheet
government
$99 Georgia pass
tax_revenueDepartment of Audits and Accounts (DOAA) summary of a University of Georgia Carl Vinson Institute of Government report
academic
$99 Georgia pass
waterMike Hopkins, Executive Director, Newton County Water and Sewerage Authority (quoted by NYT)
utility
$99 Georgia pass
waterMeta spokesperson (quoted by NYT, not named)
developer
$99 Georgia pass
investmentThe New York Times (Eli Tan), citing project cost
press
$99 Georgia pass
waterBeverly Morris, Newton County resident (quoted by NYT)
other
$99 Georgia pass
jobs_constructionAtlanta Journal-Constitution, citing project filings
press
$99 Georgia pass
investmentFulton County (via $420M bond sale), reported by AJC
government
$99 Georgia pass
investmentNoelle Walsh-Elwell, President of Cloud Operations and Innovation, Microsoft (Azure blog)
developer
$99 Georgia pass
investmentGoogle LLC (press release, quoted by Data Center Knowledge)
developer
$99 Georgia pass
otherAmy Sharma, Executive Director, Science for Georgia
advocacy
$99 Georgia pass
community_benefitAtlanta News First, citing Google/LaGrange announcement
press
$99 Georgia pass
rate_impactPatrick Bowie, LaGrange City Manager
government
$99 Georgia pass
waterFayette County Government (official press release)
government
$99 Georgia pass
waterTom's Hardware (Luke James), citing Politico reporting and Fayette County water director Vanessa Tigert
press
$99 Georgia pass
tax_revenueQTS project estimates, as relayed by City of Fayetteville government website
developer
$99 Georgia pass
jobs_permanentQTS project estimates, as relayed by City of Fayetteville government website
developer
$99 Georgia pass
investmentQTS, cited by Tom's Hardware/Politico
developer
$99 Georgia pass
investmentTeslarati (Simon Alvarez), citing Business Insider/Fortune and Develop Fulton filings
press
$99 Georgia pass
investmentAtlanta Journal-Constitution (via GovTech/Tribune Content Agency republication)
press
$99 Georgia pass
waterThree Rivers Regional Commission (DRI Report of Findings)
government
$99 Georgia pass
investmentAtlanta Journal-Constitution (via GovTech/Tribune Content Agency republication)
press
$99 Georgia pass
otherCoweta County neighbors/petitioners (per AJC/GovTech reporting)
other
$99 Georgia pass
otherCity of Fayetteville government website
government
$99 Georgia pass

Sources

Ranked highest document type firstStarts here in this view

The primary documents under this state, each with the pinpoint that makes it checkable.The documents behind every number on this page, if you want to read the filing yourself.The filings this state's records were built from, ranked highest document type first.Every document behind this page, with a page or paragraph pinpoint. These are open on every tier.The evidence file under this state, ranked by document type and review state.

137 source rows sit under this state. Every one carries an exact quote and a pinpoint. Twelve are shown here, ranked by document type and review status; the rest are on the record pages they belong to. Every source document and every pinpoint is open, on every tier.

  • Georgia PSC, Docket No. 44280, Order Approving Revisions to Georgia Power Company's Rules and Regulations (filed 01/28/2025) order two-reviewer

    “On December 11, 2024, Georgia Power Company (“* Company” or “Georgia Power”) filed a request for approval of revisions to the Company’s Rules and Regulations pursuant to O.C.G.A. § 46-2-25(a) in Docket Number 44280. The Company cited its unprecedented anticipated load growth and the need to protect customers in the event large projects do not materialize as the rationale behind this request. The rule changes apply to new customers with 100 megawatt (“MW”) or more of load connecting to Georgia Power’s system, requiring additional terms and conditions for those customers in order to allow the Company to appropriately assign costs to the customer. The proposed revisions allow for minimum billing requirements and longer contract term lengths for the new customers over 100 MW of load.”

    p.1
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/221165/102362
    Document is a scanned/image-only PDF (no text layer); this collector rendered each page at 300 DPI with PyMuPDF and OCR'd with pytesseract 5.3.4 (installed this tick), not via any AI summarization tool. The stray asterisk in “(“* Company”...)” is reproduced verbatim as an apparent OCR artifact, not corrected. PSC document ID 221165 (parent docket 44280, confirmed via the document's own Docket-detail page at https://psc.ga.gov/search/facts-document/?documentId=221165). VERIFIER RE-OCR (2026-08-20): independently re-rendered and re-OCR'd by the gate verifier; the page-1 text matches character-for-character, including the stray-asterisk artifact in “(“* Company” ...)”. Artifact preservation confirmed correct.

  • Georgia PSC, Docket No. 44280, Order Approving Revisions to Georgia Power Company's Rules and Regulations (filed 01/28/2025) order two-reviewer

    “At its January 23, 2025 Administrative Session, the Commission voted unanimously to approve Staffs recommendation. KKK WHEREFORE IT IS ORDERED, that the Commission hereby approves the revisions to the Company’s rules and regulations as requested by Georgia Power Company in its December 11, 2024 filing, as modified by Staff pursuant to O.C.G.A. § 46-2-25(a). ORDERED FURTHER, the Company shall exercise the discretion under the Rules and Regulations changes in a manner designed to protect existing customers from bearing any of the costs of adding these large customers.”

    p.2
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/221165/102362
    OCR'd as above. VERIFIER RE-OCR (2026-08-20): this collector's page-2 OCR was independently reproduced by the gate verifier (PyMuPDF 300 DPI render -> pytesseract) and matches character-for-character, including the artifact 'Staffs' (for "Staff's"). CORRECTED BY THE GATE: the collector had substituted '***' for the token tesseract actually produces here, 'KKK'. The underlying document shows a centered row of asterisks as a section break; tesseract renders that row as 'KKK'. The raw OCR token is now reproduced verbatim so that a second OCR pass re-verifies this row exactly, per the standing rule that OCR artifacts are flagged in notes and never silently cleaned.

  • Georgia PSC, Docket No. 44280 (GPC 2022 Rate Case), Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing (filed 04/17/2025) order two-reviewer

    “Under the draft terms and conditions, customers would pay the higher of tariffed rates or a minimum bill amount each billing period they are a customer. If the customer ended the contract early, the customer would be liable for the minimum bill amounts (not tariffed rate amounts) for each period for the remaining term of the contract. The tariffed rates would be subject to future review and modification by the Commission using normal ratemaking processes. However, the minimum bill amounts would not.”

    p.2
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/222325/103476
    Scanned/image-only PDF; OCR'd by this collector (PyMuPDF 300 DPI render + pytesseract 5.3.4), not via AI summarization. PSC document ID 222325 (docket confirmed via https://psc.ga.gov/search/facts-document/?documentId=222325, whose page shows Parent Docket: 44280).

  • Georgia PSC, Docket No. 44280 (GPC 2022 Rate Case), Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing (filed 04/17/2025) order two-reviewer

    $99 Georgia pass quote, 384 characters as extracted. The document, the pinpoint and the review state are open below.

    p.3 (Finding of Fact / Staff recommendation ¶3)
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/222325/103476

  • Georgia PSC, Docket No. 44280 (GPC 2022 Rate Case), Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing (filed 04/17/2025) order two-reviewer

    $99 Georgia pass quote, 752 characters as extracted. The document, the pinpoint and the review state are open below.

    p.3 (Finding of Fact / Staff recommendation ¶5)
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/222325/103476

  • Georgia PSC, Docket No. 55378, In Re: Georgia Power Company's 2023 Integrated Resource Plan Update, Order Adopting Stipulated Agreement (filed 04/26/2024) order two-reviewer

    $99 Georgia pass quote, 121 characters as extracted. The document, the pinpoint and the review state are open below.

    p.1 (caption)
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/218484/99572

  • Georgia PSC, Docket No. 55378, In Re: Georgia Power Company's 2023 Integrated Resource Plan Update, Order Adopting Stipulated Agreement (filed 04/26/2024) order two-reviewer

    $99 Georgia pass quote, 1,276 characters as extracted. The document, the pinpoint and the review state are open below.

    p.13
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/218484/99572

  • Georgia Power Company, Executed Large Load Contract Filing, Docket No. 44280 (public disclosure), filed 5/15/2026 order two-reviewer

    $99 Georgia pass quote, 338 characters as extracted. The document, the pinpoint and the review state are open below.

    Cover letter to the Executive Secretary, "Large Load Contract - Filing Executed Contract 5.15.26.docx"
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/226633/107893

  • Georgia Power Company, Basis for the Assertion that the Information Submitted is a Trade Secret, Docket No. 44280, filed 5/15/2026 order two-reviewer

    $99 Georgia pass quote, 365 characters as extracted. The document, the pinpoint and the review state are open below.

    "TS Assertion - Executed Large Load Contract Filing.docx"
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/226633/107893

  • Georgia Power Company, Quarterly Large Load Economic Development Report, Q1 2026 (PUBLIC DISCLOSURE), Docket No. 55378 / 56002 order two-reviewer

    $99 Georgia pass quote, 120 characters as extracted. The document, the pinpoint and the review state are open below.

    Attachment, "Project Name" column
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/226607/107887

  • Georgia PSC, Docket No. 55378, Order Adopting Stipulated Agreement (filed 04/26/2024) order two-reviewer

    $99 Georgia pass quote, 161 characters as extracted. The document, the pinpoint and the review state are open below.

    p.22, Attachment A, "Large Load Tracking System for Georgia Power Company"
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/218484/99572

  • Georgia PSC, Docket No. 55378, Order Adopting Stipulated Agreement (filed 04/26/2024) order two-reviewer

    $99 Georgia pass quote, 317 characters as extracted. The document, the pinpoint and the review state are open below.

    p.8
    https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/218484/99572

1 section hidden for this view. Nothing is locked by hiding. Every view can open every section on this page.