Verified Atlas / Data Centers
Built from the live database: September 14, 202657 instruments · 79 facilities · 212 claims · 1036 sourcesall with quote and pinpointEvery value on this page comes from a row in that snapshot.
View
Citable provisions first: exit and collateral language with quote and pinpoint, then the open dockets you have to re-check.

Atlas / Arizona / record

Tucson Electric Power Company Special Contract (Energy Supply Agreement) with Humphrey's Peak Power, LLC - ACC Decision No. 81587 (Docket No. E-01933A-25-0187)

two-reviewer order approved az-acc-e01933a-25-0187-tep-humphreys-peak-esa

This record is listed in full and read in part. Its identity, citation, docket, status and review state are open, and so are all 12 of its source documents with their pinpoints, so you can go read the primary text yourself. The first 3 extracted quotes are open too. The recorded term fields, and the remaining quotes, are in the $99 Arizona pass and the $199 all-states pass. Pricing.

Record created 2026-08-21, last updated 2026-08-21. Snapshot built September 14, 2026. JSON

Fields, as recorded

State
AZ
Kind
order
Status
approved
Agency
Arizona Corporation Commission (ACC)
Utility
Tucson Electric Power Company (TEP), a UNS Energy Corporation subsidiary
Citation
In the Matter of the Application of Tucson Electric Power Company for Approval of a Special Agreement for Electric Service with Humphrey's Peak Power, LLC, Ariz. Corp. Comm'n Docket No. E-01933A-25-0187, Decision No. 81587 (Open Meeting Dec. 3, 2025; docketed Dec. 10, 2025)
Docket
E-01933A-25-0187
Effective
2025-12-10
Contract term (years)
$99 Arizona pass
Minimum take %
$99 Arizona pass
Mandatory
$99 Arizona pass
Summary
$99 Arizona pass
Exit terms
$99 Arizona pass
Collateral terms
$99 Arizona pass
Generation requirements
$99 Arizona pass
Cost allocation
$99 Arizona pass
Locked fields
$99 Arizona pass 8 recorded fields on this record are in the state and all-states passes.

Sources

12 rows, every one with a quote and a pinpoint. 3 quotes open here
  • ACC Decision No. 81587, Docket No. E-01933A-25-0187 order two-reviewer

    “IT IS THEREFORE ORDERED that Tucson Electric Power Company Energy Supply Agreement with Humphrey's Peak Power, LLC, is hereby approved, as discussed herein... IT IS FURTHER ORDERED that approval of the Tucson Electric Power Company Energy Supply Agreement with Humphrey's Peak Power, LLC does not guarantee any future ratemaking treatment of the Special Contract”

    p.8-9 (ORDER paragraphs)
    https://docket.images.azcc.gov/0000215738.pdf
    Fetched via curl from docket.images.azcc.gov, imageNumber 0000215738 (a Commission-generated Decision document, distinct barcode format from e-filed party documents). Re-OCR'd at 300dpi with pytesseract; the native text layer for this document is even more badly garbled than the Staff Memorandum's (e.g. rendering 'BEFORE THE ARIZONA CORPORATION COMMISSION' with systematic O/0/() and I/l/1 confusion).

  • ACC Decision No. 81587 - Dissenting Statement of Commissioner Rachel Walden order two-reviewer

    “The load anticipated by this contract is for 286 MWs, with an additional 64 MWs to serve by in full in 2027. The 300 MWs represents between 10% - 15% of TEP's current generating capacity, and while their recent 2023 Integrated Resource Plan projected load growth in their service territory of approximately 50 MWs per year, this 300 MWs is over and above that forecasted load demand they expect to serve. TEP maintains a reserve margin of approximately 15%, which allows them to reliably serve peak load during the summer. I understand from answers TEP provided during the December 3, 2025 Open Meeting that they have some wholesale contracts that will soon be ending, but that available capacity represents only about half of the entire load contemplated by this contract.”

    p.11 (Walden dissent letter, first substantive paragraph)
    https://docket.images.azcc.gov/0000215738.pdf
    Re-OCR'd at 300dpi with pytesseract. This is the ONLY place in the fetched record (Staff Memorandum plus Decision) where a specific MW figure for the contract's load appears in plain, unredacted text. QUOTE EXTENDED AT THE AZ GATE to the reserve-margin and Dec. 3 Open Meeting sentences, which the instrument's generation_requirements field quoted with no evidence row behind them. EXTRACTION ARTIFACT, not a defect: at 300, 400, 500 and 600 dpi tesseract renders the capital I that opens 'I understand from answers' as a pipe character on this scan. The word is unambiguously 'I'. A byte-exact search will miss that one character; the gate's I/l/1/| glyph-folding fallback matches it.

  • ACC Decision No. 81587 - Dissenting Statement of Commissioner Rachel Walden order two-reviewer

    “the switchyard that will need to be constructed to serve this load was not anticipated being needed for reliability on TEP's system for at least 20 years into the future (and thus not included in the Thirteenth Biennial Transmission Assessment that this Commission voted on October 15, 2025). Constructing this switchyard to serve this customer will bring forward a roughly $25 million capital expenditure, which will be paid for through TEP's OATT and thus be included on existing customer's monthly bills in as early as 2027 or 2028. The ONLY way Humphrey's Peak would pay for $20 million of the total cost would be if Humphrey's Peak were to back out of the contract early. Otherwise, the cost will be socialized across ALL rate payers.”

    p.12 (Walden dissent letter, switchyard cost paragraph)
    https://docket.images.azcc.gov/0000215738.pdf
    Re-OCR'd at 300dpi with pytesseract. QUOTE EXTENDED AT THE AZ GATE to the $20 million sentence, which the instrument's cost_allocation quoted with no evidence row behind it.

  • ACC Decision No. 81587, Docket No. E-01933A-25-0187 - Findings of Fact order two-reviewer

    $99 Arizona pass quote, 210 characters as extracted. The document, the pinpoint and the review state are open below.

    p.8 (Findings of Fact, finding 3)
    https://docket.images.azcc.gov/0000215738.pdf

  • ACC Utilities Division Memorandum & Proposed Order, Docket No. E-01933A-25-0187 docket two-reviewer

    $99 Arizona pass quote, 143 characters as extracted. The document, the pinpoint and the review state are open below.

    p.2 (Application section)
    https://docket.images.azcc.gov/E000047706.pdf

  • ACC Utilities Division Memorandum & Proposed Order, Docket No. E-01933A-25-0187 docket two-reviewer

    $99 Arizona pass quote, 215 characters as extracted. The document, the pinpoint and the review state are open below.

    p.2 (Key ESA provisions list, item 1)
    https://docket.images.azcc.gov/E000047706.pdf

  • ACC Utilities Division Memorandum & Proposed Order, Docket No. E-01933A-25-0187 docket two-reviewer

    $99 Arizona pass quote, 338 characters as extracted. The document, the pinpoint and the review state are open below.

    p.3 (Energy Supply Agreement section)
    https://docket.images.azcc.gov/E000047706.pdf

  • ACC Utilities Division Memorandum & Proposed Order, Docket No. E-01933A-25-0187 docket two-reviewer

    $99 Arizona pass quote, 913 characters as extracted. The document, the pinpoint and the review state are open below.

    p.3 (Termination provisions)
    https://docket.images.azcc.gov/E000047706.pdf

  • ACC Utilities Division Memorandum & Proposed Order, Docket No. E-01933A-25-0187 docket two-reviewer

    $99 Arizona pass quote, 100 characters as extracted. The document, the pinpoint and the review state are open below.

    p.2 (Key ESA provisions list, item 3)
    https://docket.images.azcc.gov/E000047706.pdf

  • ACC Utilities Division Memorandum & Proposed Order, Docket No. E-01933A-25-0187 docket two-reviewer

    $99 Arizona pass quote, 675 characters as extracted. The document, the pinpoint and the review state are open below.

    p.4 (Project Construction Agreement paragraph)
    https://docket.images.azcc.gov/E000047706.pdf

  • ACC Utilities Division Memorandum & Proposed Order, Docket No. E-01933A-25-0187 docket two-reviewer

    $99 Arizona pass quote, 369 characters as extracted. The document, the pinpoint and the review state are open below.

    p.4 (transmission cost recovery paragraph)
    https://docket.images.azcc.gov/E000047706.pdf

  • ACC eDocket record for Docket No. E-01933A-25-0187 (TEP / Humphrey's Peak ESA) docket two-reviewer

    $99 Arizona pass quote, 155 characters as extracted. The document, the pinpoint and the review state are open below.

    docket record 29640, JSON fields docketStatus / filedDate / decisions[] / documents[]
    https://efiling.azcc.gov/api/edocket/docket/29640

Facilities governed by this record

  • Project Blue / Humphrey's Peak Power data center campus

    Pima · under-construction · Arizona dossier