Indiana Michigan Power (I&M) Large Load Terms, IURC Order Approving Settlement Agreement Modifying Tariff I.P. (Cause No. 46097)
two-reviewer order approved in-iurc-46097-im-large-load-tariff-order
Record created 2026-08-20, last updated 2026-08-26. Snapshot built September 14, 2026. JSON
Fields, as recorded
- State
- IN
- Kind
- order
- Status
- approved
- Agency
- Indiana Utility Regulatory Commission (IURC)
- Utility
- Indiana Michigan Power Company (I&M), an American Electric Power (AEP) subsidiary
- Citation
- In the Matter of the Verified Petition of Indiana Michigan Power Company for Approval of Modifications to its Industrial Power Tariff, Tariff I.P., Ind. Util. Regul. Comm'n Cause No. 46097, Order of the Commission (approved Feb. 19, 2025)
- Docket
- 46097
- Effective
- 2025-02-19
- Threshold MW
- $99 Indiana pass
- Contract term (years)
- $99 Indiana pass
- Ramp (years)
- $99 Indiana pass
- Minimum take %
- $99 Indiana pass
- Mandatory
- $99 Indiana pass
- Summary
- $99 Indiana pass
- Exit terms
- $99 Indiana pass
- Collateral terms
- $99 Indiana pass
- Cost allocation
- $99 Indiana pass
- Locked fields
- $99 Indiana pass 9 recorded fields on this record are in the state and all-states passes.
Sources
35 rows, every one with a quote and a pinpoint. 3 quotes open here- IURC Cause No. 46097, Order of the Commission (Indiana Michigan Power, Tariff I.P. Large Load Terms) order two-reviewer
“Under the Settlement Agreement, the Large Load Terms will apply to customers taking service on I&M Tariff I.P. with contract capacity greater than or equal to 70 MW at an individual site or 150 MW on an aggregated basis (“Large Load Customer”).”
p.31 (Finding A, Applicability)
https://www.in.gov/iurc/files/ord_46097_021925.pdf
Fetched via curl with a browser User-Agent directly from in.gov/iurc; text-extracted with pdfplumber (73 pages). [VERIFIER GATE 2026-08-20] Pinpoint corrected from "p.30 (Finding A, Applicability)". The Order's printed page numbers and the PDF's page indices coincide exactly (printed '31' sits on PDF page 31), so the recorded pinpoints were simply off; the quotes themselves re-matched verbatim. [VERIFIER GATE 2026-08-20] OCR DISCLOSURE the collector's notes did not carry: this PDF's text layer was produced by Adobe Acrobat 'Paper Capture Plug-in' (PDF Producer field), i.e. it is an OCR layer over a scanned document, not a born-digital text layer. Every quote in this corpus taken from ord_46097_021925.pdf was independently re-extracted from that same layer by the verifier and re-matched; artifacts that layer introduces (e.g. 'semi -annual' at p.50, the doubled sheet number 'ORIGINAL SHEET NO. 21.321.7' at p.73) are preserved verbatim wherever they fall inside a quote. - IURC Cause No. 46097, Order of the Commission order two-reviewer
“As shown in Section I.A.2 of the Settlement Agreement, the Settling Parties agreed to an Initial Contract Term of not less than 12 years, commencing after any Load Ramp Period ends. The Load Ramp Period can be no greater than five years.”
p.31 (Finding B, Mandatory Term)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
“the monthly demand so established shall in no event be less than the greater of (a) 80 percent of the Large Load Customer’s contract capacity specified for the applicable time period of the Contract Term; or (b) 80 percent of the Large Load Customer’s highest previously established Monthly Billing Demand during the past 11 months.”
p.33 (Finding C, Monthly Billing Demand, Settlement Agreement § I.A.3 tariff language reproduced in the Order)
https://www.in.gov/iurc/files/ord_46097_021925.pdf
[VERIFIER GATE 2026-08-20] Pinpoint corrected from "p.32 (Finding C, Monthly Billing Demand; Settlement Agreement Attachment A)". The Order's printed page numbers and the PDF's page indices coincide exactly (printed '31' sits on PDF page 31), so the recorded pinpoints were simply off; the quotes themselves re-matched verbatim. - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 478 characters as extracted. The document, the pinpoint and the review state are open below.
p.36 (Finding E, Collateral Requirements; Finding E opens on p.35)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 484 characters as extracted. The document, the pinpoint and the review state are open below.
p.37 (Finding F, Contractual Flexibility and Exit Fee)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 210 characters as extracted. The document, the pinpoint and the review state are open below.
p.49 (Ordering Paragraph 3)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 338 characters as extracted. The document, the pinpoint and the review state are open below.
Settlement Agreement Attachment A (Section I.A.1, reproduced within the Order)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 281 characters as extracted. The document, the pinpoint and the review state are open below.
Settlement Agreement Attachment A, Collateral Requirements clause (reproduced within the Order, immediately following Tariff I.P. Sheet No. 21.7)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 231 characters as extracted. The document, the pinpoint and the review state are open below.
p.39 (Finding F, CAC witness Inskeep testimony)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 359 characters as extracted. The document, the pinpoint and the review state are open below.
p.33 (Finding C, OUCC witness Eckert testimony)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 164 characters as extracted. The document, the pinpoint and the review state are open below.
p.51 (unnumbered), Concurring Opinion of Chairman James F. Huston and Commissioner Wesley R. Bennett, a separately captioned document bound into the same PDF immediately after the Order's p.50 signature page
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 37 characters as extracted. The document, the pinpoint and the review state are open below.
PDF document metadata (CreationDate field)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097 -- Order of the Commission (Indiana Michigan Power, Tariff I.P. Large Load Terms) order two-reviewer
$99 Indiana pass quote, 144 characters as extracted. The document, the pinpoint and the review state are open below.
- IURC Cause No. 46097 -- Order of the Commission (Indiana Michigan Power, Tariff I.P. Large Load Terms) order two-reviewer
$99 Indiana pass quote, 166 characters as extracted. The document, the pinpoint and the review state are open below.
- IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 232 characters as extracted. The document, the pinpoint and the review state are open below.
p.34 (Finding D, Minimum Charge, Settlement Agreement § I.A.4 tariff language and rate table, reproduced in the Order)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 204 characters as extracted. The document, the pinpoint and the review state are open below.
p.34 (Finding D, Minimum Charge, I&M witness Williamson)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 736 characters as extracted. The document, the pinpoint and the review state are open below.
p.35 (Finding D, Minimum Charge, CAC witness Inskeep's worked example)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 260 characters as extracted. The document, the pinpoint and the review state are open below.
p.38 (Finding F, I&M witness Williamson on the Exit Fee Period)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 497 characters as extracted. The document, the pinpoint and the review state are open below.
p.38 (Finding F, Settlement Agreement § I.A.6.c, mitigation)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 481 characters as extracted. The document, the pinpoint and the review state are open below.
Settlement Agreement Attachment A, Tariff I.P. sheet (Original Sheet No. 21.7), Collateral Requirements, acceptable forms (PDF p.73)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 258 characters as extracted. The document, the pinpoint and the review state are open below.
p.40 (Finding F, the Commission's own findings)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 564 characters as extracted. The document, the pinpoint and the review state are open below.
p.18 (Google witness Farr's recommended policies)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 439 characters as extracted. The document, the pinpoint and the review state are open below.
p.50 (Ordering Paragraphs 6-8; signature block)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 311 characters as extracted. The document, the pinpoint and the review state are open below.
p.7 (OUCC witness Kelley's testimony)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 339 characters as extracted. The document, the pinpoint and the review state are open below.
pp.12-13 (Data Center Intervenor Evidence, A. Amazon, witness Fradette)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC Cause No. 46097, Order of the Commission order two-reviewer
$99 Indiana pass quote, 322 characters as extracted. The document, the pinpoint and the review state are open below.
p.18 (Data Center Intervenor Evidence, C. Google, witness Farr)
https://www.in.gov/iurc/files/ord_46097_021925.pdf - IURC docketed case record, Cause No. 46097, Orders (Commission case-management database) government two-reviewer
$99 Indiana pass quote, 328 characters as extracted. The document, the pinpoint and the review state are open below.
api/document/orders response for legalcaseid b8cd5780-0546-ef11-8409-001dd803817e
https://iurc.portal.in.gov/docketed-case-details/?id=b8cd5780-0546-ef11-8409-001dd803817e - IURC docketed case record, Cause No. 46097, Parties government two-reviewer
$99 Indiana pass quote, 927 characters as extracted. The document, the pinpoint and the review state are open below.
api/list/parties response for legalcaseid b8cd5780-0546-ef11-8409-001dd803817e
https://iurc.portal.in.gov/docketed-case-details/?id=b8cd5780-0546-ef11-8409-001dd803817e - IURC docketed case record, Cause No. 46097, case status and appeals government two-reviewer
$99 Indiana pass quote, 189 characters as extracted. The document, the pinpoint and the review state are open below.
api/search/advanced response (txtCause=46097) and api/document/appeals response
https://iurc.portal.in.gov/docketed-case-details/?id=b8cd5780-0546-ef11-8409-001dd803817e - City of Fort Wayne, "Google Data Center" FAQ, ELECTRICITY USEAGE section government two-reviewer
$99 Indiana pass quote, 379 characters as extracted. The document, the pinpoint and the review state are open below.
FAQ, "How will the data center affect electric utility rates for the average customer?"
https://engage.cityoffortwayne.org/data-center - Indiana Michigan Power Receives Order in Large Load Settlement (I&M/AEP press release) company two-reviewer
$99 Indiana pass quote, 476 characters as extracted. The document, the pinpoint and the review state are open below.
Body, paragraphs 1-2 and quote paragraph
https://www.prnewswire.com/news-releases/indiana-michigan-power-receives-order-in-large-load-settlement-302380806.html - Indiana Michigan Power Receives Order in Large Load Settlement (I&M/AEP press release) company two-reviewer
$99 Indiana pass quote, 205 characters as extracted. The document, the pinpoint and the review state are open below.
Body, penultimate paragraph
https://www.prnewswire.com/news-releases/indiana-michigan-power-receives-order-in-large-load-settlement-302380806.html - GovTech / The Times (Munster, Ind.), "Indiana Data Center Could Bring Significant Power Use" journalism two-reviewer
$99 Indiana pass quote, 177 characters as extracted. The document, the pinpoint and the review state are open below.
Body, I&M paragraph
https://www.govtech.com/artificial-intelligence/indiana-data-center-could-bring-significant-power-use - GovTech / The Times (Munster, Ind.), "Indiana Data Center Could Bring Significant Power Use" journalism two-reviewer
$99 Indiana pass quote, 321 characters as extracted. The document, the pinpoint and the review state are open below.
Body, Inskeep paragraph
https://www.govtech.com/artificial-intelligence/indiana-data-center-could-bring-significant-power-use - The Journal Gazette, "Google announces $2 billion investment in Fort Wayne data center" (Maya Wilkins) journalism two-reviewer
$99 Indiana pass quote, 269 characters as extracted. The document, the pinpoint and the review state are open below.
Body, Kava/I&M paragraph
https://www.journalgazette.net/business/google-announces-2-billion-investment-in-fort-wayne-data-center/article_407f8a2c-03e0-11ef-b4ce-b3bc10dc55f0.html
Facilities governed by this record
- Amazon Web Services (AWS) New Carlisle Data Center Campus (Indiana Enterprise Center, St. Joseph County)
St. Joseph County · operating · Indiana dossier
- Google Fort Wayne Data Center Campus (Allen County)
Allen County · operating · Indiana dossier