S.B. 6 Implementation (ombrella project)
two-reviewer docket pending tx-puct-project58317-sb6-implementation
Record created 2026-08-20, last updated 2026-08-20. Snapshot built September 14, 2026. JSON
Fields, as recorded
- State
- TX
- Kind
- docket
- Status
- pending
- Agency
- Public Utility Commission of Texas (PUCT)
- Citation
- Public Utility Commission of Texas, Project No. 58317, SB 6 Implementation
- Docket
- Project No. 58317
- Mandatory
- $99 Texas pass
- Summary
- $99 Texas pass
- Locked fields
- $99 Texas pass 2 recorded fields on this record are in the state and all-states passes.
Sources
2 rows, every one with a quote and a pinpoint. 2 quotes open here- PUCT Interchange Filing Search, Filings for Control Number 58317 docket two-reviewer
“Case Style SB 6 IMPLEMENTATION 36 filing(s). Item File Stamp Party Item Type Filing Description 1 6/30/2025 PUC RULES AND PROJECTS PRJ Request for control number 2 7/8/2025 PUC RULES AND PROJECTS PRJ Notice of July 21 Workshop 3 7/14/2025 PUC RULES AND PROJECTS PRJ July 21 Workshop Agenda 4 7/24/2025 PUC RULES & PROJECTS PRJ Response to Commission Request for Information Regarding Net Metering Arrangements Under PURA ยง 39.169 5 8/1/2025 PUC RULES & PROJECTS PRJ Staff Memo and Roadmap”
Case Style field; Items 1-8
https://interchange.puc.texas.gov/Search/Filings?utilityType=&controlNumber=58317
Fetched directly via curl (raw HTML), tags stripped and entities decoded locally. QUOTE REFRESHED AT VERIFICATION (2026-08-20): the docket is live and its filing counter had moved from '30 filing(s)' at collection to '36 filing(s)' at re-verification. Items 1-5 are unchanged and were re-matched verbatim; only the count differed. Recorded as live-docket drift, not as a quote defect. - PUCT Interchange Filing Search, Filings for Control Number 58317 docket two-reviewer
“25 8/6/2026 PUC OPDM PRJ CHAIRMAN GLEESON MEMORANDUM 26 8/6/2026 PUC DEPUTY EXECUTIVE DIRECTOR LTRS Governor Abbott's August 3, 2026 letter to PUCT and ERCOT re: Verification of Data Center Information 27 8/10/2026 ERCOT LTRS ERCOT LETTER REGARDING PROJECT NO. 59142 FILING 28 8/13/2026 Nelda Howton TEST Testimony for PUC Commiss”
Items 25-28 (filings added after the original collection)
https://interchange.puc.texas.gov/Search/Filings?utilityType=&controlNumber=58317
Added at the TX state gate (2026-08-20). Fetched directly via curl (raw HTML), tags stripped and entities decoded locally. Material development not in the record at collection: the Governor's August 3, 2026 letter to PUCT and ERCOT on 'Verification of Data Center Information,' filed into the S.B. 6 implementation docket on 8/6/2026 alongside a Chairman Gleeson memorandum. The docket still shows no order or final disposition, so the instrument's 'pending' status is unchanged. Quote is truncated mid-word at Item 28 exactly as the contiguous span was captured.