Verified Atlas / Data Centers
Built from the live database: September 14, 202657 instruments · 79 facilities · 212 claims · 1036 sourcesall with quote and pinpointEvery value on this page comes from a row in that snapshot.
View
Citable provisions first: exit and collateral language with quote and pinpoint, then the open dockets you have to re-check.

Atlas / Texas / record

S.B. 6 Implementation (ombrella project)

two-reviewer docket pending tx-puct-project58317-sb6-implementation

This record is listed in full and read in part. Its identity, citation, docket, status and review state are open, and so are all 2 of its source documents with their pinpoints, so you can go read the primary text yourself. The first 2 extracted quotes are open too. The recorded term fields, and the remaining quotes, are in the $99 Texas pass and the $199 all-states pass. Pricing.

Record created 2026-08-20, last updated 2026-08-20. Snapshot built September 14, 2026. JSON

Fields, as recorded

State
TX
Kind
docket
Status
pending
Agency
Public Utility Commission of Texas (PUCT)
Citation
Public Utility Commission of Texas, Project No. 58317, SB 6 Implementation
Docket
Project No. 58317
Mandatory
$99 Texas pass
Summary
$99 Texas pass
Locked fields
$99 Texas pass 2 recorded fields on this record are in the state and all-states passes.

Sources

2 rows, every one with a quote and a pinpoint. 2 quotes open here
  • PUCT Interchange Filing Search, Filings for Control Number 58317 docket two-reviewer

    “Case Style SB 6 IMPLEMENTATION 36 filing(s). Item File Stamp Party Item Type Filing Description 1 6/30/2025 PUC RULES AND PROJECTS PRJ Request for control number 2 7/8/2025 PUC RULES AND PROJECTS PRJ Notice of July 21 Workshop 3 7/14/2025 PUC RULES AND PROJECTS PRJ July 21 Workshop Agenda 4 7/24/2025 PUC RULES & PROJECTS PRJ Response to Commission Request for Information Regarding Net Metering Arrangements Under PURA ยง 39.169 5 8/1/2025 PUC RULES & PROJECTS PRJ Staff Memo and Roadmap”

    Case Style field; Items 1-8
    https://interchange.puc.texas.gov/Search/Filings?utilityType=&controlNumber=58317
    Fetched directly via curl (raw HTML), tags stripped and entities decoded locally. QUOTE REFRESHED AT VERIFICATION (2026-08-20): the docket is live and its filing counter had moved from '30 filing(s)' at collection to '36 filing(s)' at re-verification. Items 1-5 are unchanged and were re-matched verbatim; only the count differed. Recorded as live-docket drift, not as a quote defect.

  • PUCT Interchange Filing Search, Filings for Control Number 58317 docket two-reviewer

    “25 8/6/2026 PUC OPDM PRJ CHAIRMAN GLEESON MEMORANDUM 26 8/6/2026 PUC DEPUTY EXECUTIVE DIRECTOR LTRS Governor Abbott's August 3, 2026 letter to PUCT and ERCOT re: Verification of Data Center Information 27 8/10/2026 ERCOT LTRS ERCOT LETTER REGARDING PROJECT NO. 59142 FILING 28 8/13/2026 Nelda Howton TEST Testimony for PUC Commiss”

    Items 25-28 (filings added after the original collection)
    https://interchange.puc.texas.gov/Search/Filings?utilityType=&controlNumber=58317
    Added at the TX state gate (2026-08-20). Fetched directly via curl (raw HTML), tags stripped and entities decoded locally. Material development not in the record at collection: the Governor's August 3, 2026 letter to PUCT and ERCOT on 'Verification of Data Center Information,' filed into the S.B. 6 implementation docket on 8/6/2026 alongside a Chairman Gleeson memorandum. The docket still shows no order or final disposition, so the instrument's 'pending' status is unchanged. Quote is truncated mid-word at Item 28 exactly as the contiguous span was captured.