Rate Schedule GS-5 (Large-Load / High Energy Use Customer Class), Dominion Energy Virginia 2025 Biennial Review
two-reviewer tariff approved va-dominion-gs5-pur2025-00058-tar
Record created 2026-08-19, last updated 2026-08-26. Snapshot built September 14, 2026. JSON
Fields, as recorded
- State
- VA
- Kind
- tariff
- Status
- approved
- Agency
- Virginia State Corporation Commission (SCC)
- Utility
- Virginia Electric and Power Company d/b/a Dominion Energy Virginia
- Citation
- Application of Virginia Electric and Power Company for a 2025 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services pursuant to § 56-585.1 A of the Code of Virginia, Case No. PUR-2025-00058, 2025 S.C.C. Ann. Rept. 521, 527-528, Final Order
- Docket
- PUR-2025-00058
- Effective
- 2027-01-01
- Threshold MW
- $99 Virginia pass
- Contract term (years)
- $99 Virginia pass
- Minimum take %
- $99 Virginia pass
- Mandatory
- $99 Virginia pass
- Summary
- $99 Virginia pass
- Exit terms
- $99 Virginia pass
- Collateral terms
- $99 Virginia pass
- Generation requirements
- $99 Virginia pass
- Cost allocation
- $99 Virginia pass
- Locked fields
- $99 Virginia pass 9 recorded fields on this record are in the state and all-states passes.
Sources
12 rows, every one with a quote and a pinpoint. 3 quotes open here- State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order (Application of Virginia Electric and Power Company for a 2025 biennial review) order two-reviewer
“The GS-5 rate class shall include customers with: (1) a measured or contracted demand of 25 megawatts (“MW”) or greater on a contiguous site; and (2) a measured or expected load factor of at least 75%.”
p.23 ("RATE SCHEDULE GS-5" / "GS-5 Rate Class")
https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF
Primary Final Order; downloaded directly (PDF, 30 pages) and text-extracted with pdfplumber. Document header/date stamp reads "AT RICHMOND, NOVEMBER 25, 2025" / "11/25/2025 - 12:14 PM" (Document Control Center). See separate source below (PUR-2026-00056 order) for a conflicting "Nov. 5, 2025" citation of this same Final Order. - State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order order two-reviewer
“The contract provisions shall apply to customers taking initial service and signing an ESA on or after January 1, 2027. The contract term shall be 14 years. A customer may also include, within the contract term, a load ramp period not to exceed four years (with a minimum annual ramp of 20%). If the customer continues to take service after the conclusion of the contract term, the minimum charges approved herein shall continue. If the customer ceases operations or otherwise defaults on its agreement during the contract term, the customer shall be required to pay an exit fee covering any outstanding minimum charges over the remaining contract duration (subject to capacity reassignment as addressed below).”
p.24 ("Contract")
https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF
ESA = Electric Service Agreement. - State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order order two-reviewer
“The collateral requirements shall apply to customers taking initial service and signing an ESA on or after January 1, 2027. The Commission approves the Company’s proposed collateral requirement terms, including: (1) $1.5 million/MW; (2) a reduction up to 70% based on the customer’s established credit; (3) provisions for third-party guarantees and letters of credit; and (4) releasing 1714th of the collateral requirement each year throughout the contract term.”
p.25 ("Collateral Requirements")
https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF
Quoted exactly as extracted from the PDF, including "1714th" -- almost certainly an OCR/text-layer artifact for "1/14th" (14 = the contract term in years) but not corrected in the quote field per collection rules. - State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order order two-reviewer
$99 Virginia pass quote, 243 characters as extracted. The document, the pinpoint and the review state are open below.
p.25 ("Minimum Demand Charges")
https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF - State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order order two-reviewer
$99 Virginia pass quote, 559 characters as extracted. The document, the pinpoint and the review state are open below.
pp.25-26
https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF - State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order order two-reviewer
$99 Virginia pass quote, 279 characters as extracted. The document, the pinpoint and the review state are open below.
p.27 ("Capacity Reductions")
https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF - State Corporation Commission of Virginia, Case No. PUR-2025-00058, Final Order order two-reviewer
$99 Virginia pass quote, 355 characters as extracted. The document, the pinpoint and the review state are open below.
pp.22-23 ("Large Load Interconnection Queue")
https://www.scc.virginia.gov/docketsearch/DOCS/89g601!.PDF - State Corporation Commission of Virginia, Case No. PUR-2026-00056, Final Order (Rider T1 rate adjustment clause) order two-reviewer
$99 Virginia pass quote, 324 characters as extracted. The document, the pinpoint and the review state are open below.
p.3, footnote 9
https://www.scc.virginia.gov/docketsearch/DOCS/8dt001!.PDF - Virginia SCC, "SCC Data Center Initiatives: Ensuring Data Centers Pay Their Own Costs" (fact sheet) government two-reviewer
$99 Virginia pass quote, 384 characters as extracted. The document, the pinpoint and the review state are open below.
p.2 ("WHAT MINIMUM CHARGES WILL APPLY TO LARGE LOAD CUSTOMERS?")
https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/fact-sheets/scc-data-center-initiatives-02-2026.pdf - Virginia SCC, "SCC Data Center Initiatives: Ensuring Data Centers Pay Their Own Costs" (fact sheet) government two-reviewer
$99 Virginia pass quote, 578 characters as extracted. The document, the pinpoint and the review state are open below.
- Virginia SCC DocketSearch case record for Case No. PUR-2025-00058 (VW_EDOCKET_MATTERDETAILS, MATTER_NO 146025) government two-reviewer
$99 Virginia pass quote, 576 characters as extracted. The document, the pinpoint and the review state are open below.
case detail record, Final_Order_Date / Disposition_Date / Status / Appealed fields
https://www.scc.virginia.gov/DocketSearchAPI/breeze/CaseDetails/GetDetail?$filter=Case_Number%20eq%20'PUR-2025-00058' - Thomas Jefferson Institute for Public Policy, "The SCC Decides: Dominion’s Rates and Profits Go Up, New Rules on Data Centers" (by Stephen D. Haner) advocacy two-reviewer
$99 Virginia pass quote, 362 characters as extracted. The document, the pinpoint and the review state are open below.
article body, paragraph beginning "One goal of the new contract requirements..."
https://www.thomasjeffersoninst.org/the-scc-decides-dominions-rates-and-profits-go-up-new-rules-on-data-centers/